Shopfronts & retail frontage
Aluminium glazed frontage with toughened glass doors, ACP fascia above and signage surrounds. Usually the whole package in one order, fitted outside trading hours.
- Glazed frontage
- ACP fascia
- Glass doors
Six years of commercial and residential jobs across Davangere district. Here is what those typically look like, and what we actually do on each one.
Project types
We serve commercial properties most often — shops, offices, showrooms and industrial units — alongside residential windows, ceilings and partitions.
Aluminium glazed frontage with toughened glass doors, ACP fascia above and signage surrounds. Usually the whole package in one order, fitted outside trading hours.
Aluminium and glass cabin partitions, acoustic divisions, gypsum false ceiling and the electrical coordination that has to happen before either goes in.
Aluminium sliders and uPVC casements sized to the actual opening, including replacement work where old timber or steel frames have failed.
Full ACP cladding over a fabricated aluminium sub-frame, set out so the shadow-gap joints line through across the whole facade rather than drifting panel by panel.
Ventilators, louvres, SS railings, gates and grills for units in and around Karur Industrial Area. Practical work, built to survive being used hard.
Cutting, grooving and panel fabrication supplied to other contractors and interior firms. You bring the drawing or the sheet; we return it ready to fix.
Photographs
51 posted by us and 10 by customers. Until the gallery here is built out, that listing is the fastest way to see finished jobs — and to check what other people said about them.
Fig. 02 — Section stock
On every job
01
Every opening, on site, by the person who will fabricate it. Not from a drawing and not over the phone.
02
Brick, block, concrete and existing frames all need different anchoring. We check the substrate before quoting.
03
Backer rod and sealant where it belongs. Most window leaks are a sealing failure, not a frame failure.
04
Rollers, locks and handles set before we leave, so a slider that runs well on day one still runs well later.
05
Protective film off, site cleared, and we go around the work with you before it is called finished.
Either is enough to start. Send what you have and we will come and measure the rest.